AltaLink

Overview

10,400 square foot, pre-engineered structural steel turnkey project completed for Sherwood Developments. The building is comprised of office and shop that are separated by a 2 hour fire wall.

SRC was involved from project inception, assisting in proforma creation and management, lease negotiation and a full design build.

Date

2017

Construction Cost

1.7 Million

Client

Sherwood Developments

Address

3688 30 St N, Lethbridge, AB

Procurement

Design Build

Design Team

Ian Moxon Architect, Sunwise Engineering, BCB Engineer